Collin County ranks as one of the top growth areas in the state and the nation. Since the 2000 census, the county's population grew more than 52 percent by 2009, including massive private and commercial development. In that light, Collin County officials continue to evaluate and prepare for the next major outer-loop thoroughfare.
In December 2002, Collin County initiated the Outer Loop Alignment Study to develop various alignments within and along a 3,000-foot-wide corridor. The study identified a locally preferred alignment in order to determine right-of-way needs for the road to be built when the time comes.
Most recently, Commissioners approved contracts with local engineering firms to refine the technically preferred alignment and finalize the engineering design of several segments of more than 50 miles of Collin County’s portion of the regional outer loop.
Additional information and project study maps regarding the Collin County Outer Loop Alignment Study can be viewed by clicking the links below.
Outer Loop Overview
Segment 1: U.S. 75 to S.H. 121 (in Melissa)
Segment 1: Technically Preferred Alignment (November 2006)
Segment 1: Local Environmental Document
Segment 2: FM 6 to Rockwall County line
NEW as of September 2010:
Segment 2: Technically Preferred Alignment Approved for Public Meetings (Updated September 2010)
Segment 2: Technically Preferred Alignment Approved for Public Meetings (July 2009)
Segment 2: Environmental Contraints
September 17, 2009 Nevada, TX:
Segment
2 and 4 Alignment Presentation at Community High School
Segment 3: Dallas North Tollway to U.S. 75
Segment 3: Technically Preferred Alignment (updated August 2012)
August 6, 2012, Public Hearing
Segment 3: SH 289 to FM 2478 Presentation
Segment 3: SH 289 to FM 2478 Alignment Alternatives
Segment 3: SH 289 to FM 2478 Approved Technically Preferred Alignment
Public Comment Form
Combined Final Report
May 10, 2012, Collin County Toll Road Authority Meeting:
Segment 3 Diagrammatic Layout
Oct. 24, 2011, Collin County Toll Road Authority Meeting:
Segment 3 Presentation
Segment 3 Study Findings
Segment 3 Diagrammatic Layout
Segment 3: Technically Approved Alignment (August 1, 2011)
August 1, 2011, Collin County Toll Road Authority Meeting:
Segment 3 Alignment Alternatives
Segment 3 Presentation to Court
Segment 3 Final Report
May 16, 2011 Public Hearing:
Outer Loop Public Comment Form
Outer Loop Segment 3 Map (April 2011)
Public Hearing Presentation
April 11, 2011, Collin County’s Toll Road Authority Meeting
August 26, 2010, Weston, TX Property Owners Meeting:
DRAFT Segment 3 Alignment
Segment 3: Technically Preferred Alignment (November 2006)
Segment 4: U.S. 380 to FM 6
NEW as of September 2010:
Segment 4: Technically Preferred Alignment Approved for Public Meetings (Updated September 2010)
Segment 4: Technically Preferred Alignment Approved for Public Meetings (July 2009)
Segment 4: Environmental Constraints
September 17, 2009 Nevada, TX:
Segment
2 and 4 Alignment Presentation at Community High School
Segment 5: S.H. 121 to U.S. 380 (Farmersville)
Segment 5: Technically Preferred Alignment (November 2006)
Historical Documents and Information
Historical Corridor & Alignment Study documents
|